About the Project
Flagler House is undergoing a transformative revitalization, replacing a 60-year-old condominium with a contemporary residential building that offers the same number of units and modern amenities. This project not only enhances the living experience for residents but also contributes to the surrounding community with thoughtful design, increased green spaces, and significant public benefits. The future for 3705 South Flagler Drive will be a symbol of progress, integrating seamlessly into its historic surroundings while setting a new standard for luxury living in West Palm Beach.
Community Benefits
Community Enhancement: The new design includes a beautifully landscaped pedestrian pathway that connects Washington Road and South Flagler Drive. It features a vibrant plaza on South Flagler Drive, complete with seating and a hydration station for both people and pets as well as a pedestrian crosswalk across South Flagler Drive. All of this is safeguarded by 24-hour security monitoring, ensuring a safe and enjoyable experience for everyone.
Economic Impact: The new development is expected to significantly boost neighboring property values and generate $2.7 million and $1.5 million in annual tax revenues for the City of West Palm Beach and Palm Beach County, respectively, compared to $46,000 and $25,000 today.
Environmental Benefits: With a comprehensive focus, the project includes both conventional and advanced drainage systems aimed at improving resiliency and stormwater management for nearby neighbors and roadways, sustainable native landscaping and an environmentally conscious design that emphasizes light and greenery.
Aesthetic Harmony: The architecture blends contemporary design with classical proportions, ensuring the new building complements its surroundings while enhancing the overall natural aesthetic of the area.

Site Overview
.png)
Design Features & Benefits
A stylish 18-story residential tower featuring 39 spacious residential units on 1.4 acres
49% open space, as well as seven fewer units and a lower density than permitted
Classical architectural design that seamlessly integrates with the surrounding buildings and natural environment
Narrow tower design maximizes light and air while minimizing impact on adjacent properties
Resilient native landscaping to create enhanced buffers
Harmonious integration of public and private spaces on the property
Concealed garage with ample parking, EV charging stations and a service entrance to effectively manage on-site vehicles
The design includes a lush garden and yoga lawn, a flora-filled pool deck with a swimming pool, hot tub, day cabanas and lounges. Additional features include a dog grooming salon, a planned boat dock, and a small number of boat slips.
Pedestrian access is available at multiple points along both the project’s western and eastern entrances
This project is envisioned to blend progressive architectural aesthetics with green building principles to meet the National Green Building Standards (NGBS) certification, while also responding to the unique environmental challenges posed by its nearby coastal location
In pursuit of NGBS Gold level certification, the project incorporates several environmentally friendly design elements such as high-efficiency mechanical systems, water conservation fixtures, and low-emission building materials including low VOC paint
The building's envelope will be designed to minimize thermal bridging, with high-performance glazing that enhances insulation and reduces energy demand for heating and cooling
Additionally, sustainable construction practices, such as waste reduction, the use of recycled materials, and responsible sourcing of construction products, further support the building’s green certification objectives
The NGBS program has 6 impactful categories (Lot Design & Preparation, Resource Efficiency, Energy Use, Water Use, Indoor Environmental Quality, and Operations & Maintenance) With 489 specific green building criteria, the project will include 504 required for Gold level certification level
-
What is the vision for the new proposed Flagler House?A contemporary, aesthetically pleasing residential project that seamlessly integrates with the surrounding community and delivers a variety of public benefits.
-
What are the expected start and completion dates for the project?The construction start date depends upon city approval, which can be anywhere from 12-24 months. At this time, the expected project completion would be 2030.
-
Where are we in the process?The application for rezoning and approvals (Level II Site Plan, RPD) has been submitted and is awaiting formal review.
-
How soon will demolition begin?Demolition typically follows soon after construction approval and site readiness and will take about 30 days to complete.
-
What is the current zoning for the project?Currently zoned as Multifamily High Density (MF32); the applicant seeks to rezone to Residential Planned Development (RPD).
-
How will the building’s design, height, and layout compare to the existing structure and surrounding developments?The proposed development is an 18-story residential tower with 39 luxury units, matching the number of units in the existing structure but offering significantly larger layouts, ranging from two to seven bedrooms. Unit sizes will range from 2,770 sq. ft. up to 10,150 sq. ft. for the penthouse, catering to the luxury market. The design includes expansive, clear glass balconies with floor-to-ceiling sliding doors to enhance views and transparency. The building's height has been approved by the FAA as non-hazardous to air navigation and aligns with neighboring residential towers in the area, optimizing the site’s potential while harmonizing with the area.
-
What amenities will the new development offer?For residents, the project includes a lush garden and yoga lawn, a state-of-the-art fitness center, Pilates and yoga studio, a flora-filled pool deck with a swimming pool, hot tub, day cabana and lounges, along with planned boat-dock and anticipated 4-5 boat slips. For the community, there will be a pedestrian plaza along Flagler Drive with a hydration station for people and pets, a commercial pet grooming location and a landscaped pedestrian pathway that connects Washington Road and Flagler Drive.
-
Will there be any changes to the local infrastructure, and what amenities will accompany the walkways?Yes, the project includes significant improvements to open public spaces, such as a pedestrian walkway connecting Washington Road and South Flagler Drive. This walkway will feature well-lit areas, 24-hour security monitoring, and gated access from dusk to sunset for neighborhood residents. Additionally, the site will offer a pedestrian plaza with benches and a hydration station for both people and pets along South Flagler Drive. The project will also implement an enhanced drainage system designed to improve water management and support the drainage needs of neighboring buildings.
-
Have you conducted a shade study for neighboring views?We thoughtfully created the narrow design of the building to maximize views for both residents and neighboring properties. This design allows for significant light and air to flow through the site, minimizing potential impacts on adjacent properties. A shade study was conducted as part of the planning process to help determine the optimal design to best preserve views and limit any impact on neighbors.
-
How will parking be managed to meet the needs of residents, visitors, and staff while minimizing street impact?The design ensures sufficient parking to meet city requirements and minimize on-street parking. The development will feature 87 parking spaces, which equate to more than two spaces per unit. A concealed two-level parking garage, with the first level positioned partially below grade and out of public view, will provide ample parking for residents, visitors and clients of the pet grooming facility. Electric vehicle charging stations and a dedicated storage room for 39 bicycles are also included. Surface parking spaces are also available for deliveries and public use. Service vehicles will be able to temporarily park near the Washington Road entry.
-
How will construction parking and staging be managed to minimize impact on neighborhood streets?Construction workers will be bused in daily to minimize traffic and avoid roadblocks in the neighborhood. An on-site construction manager will oversee operations to ensure compliance. Workers parking on neighborhood streets will face penalties. Machinery and trucks will be staged on-site whenever possible to reduce disruptions. Additional details will be outlined in the construction management plan as the project progresses.
-
How will the development address potential strain on local public services such as schools and emergency services?This building will have the same number of residential units as the previous one. Additionally, the project is taking part in the necessary studies to ensure that it is developed in a manner that is in line with public services.
-
How will the project impact traffic in the area?The development is in compliance with Palm Beach County Traffic Performance Standards. This was confirmed with a traffic performance study generated during daily peak hour trips, both AM and PM.
-
Our neighborhood currently has many issues with visitors parking on residential streets. Can parking permits be arranged?While we do not have the authority to implement parking permits for public streets, we are committed to helping residents address this issue. We can assist in communicating with the City of West Palm Beach to explore effective parking solutions. If parking challenges persist, we recommend reaching out to the City to learn more about the process for initiating a residential parking permit petition. We're here to support you in navigating this process and advocating for the needs of our community.
-
What are the landscaping buffer details, including tree height and compliance with code requirements?The project includes a 10-foot landscaped buffer along Washington Road, exceeding the city’s code requirement of a 5-foot buffer for residential areas and a 10-foot buffer for roadways. The design features dense landscaping, with tree heights range from 6-to-22 ft., to enhance visual screening and create an attractive, natural boundary between the properties.
-
Will this project cause more flooding/drainage issues in the area?Actually, this project will dramatically improve drainage in the area. The drainage system for the site and nearby roadway along Flager Drive is being designed to reduce the impacts of heavy rains, King Tides and rising sea levels that have caused periodic flooding.
-
Will the foundation construction be safe for the adjacent buildings and environment?Yes, the foundation construction using the Deep Soil Mixing (DSM) method will be safe for adjacent buildings and the environment. This innovative method eliminates the need for heavy vibratory equipment and dewatering, which significantly reduces the risk of vibrations and soil displacement that could affect nearby structures. Since DSM uses a vibrationless system, it minimizes the potential for structural damage or disturbances to adjacent buildings that could occur with traditional foundation construction methods. Additionally, by not requiring dewatering, the DSM method helps protect the water table, reducing the risk of water-related environmental impacts. It also minimizes carbon emissions because it eliminates the need for continuous pumping equipment, contributing to a more environmentally friendly construction process. The reduced noise pollution from not using vibratory equipment further enhances the safety and comfort of the surrounding environment. Overall, DSM offers a safer and more sustainable alternative to traditional foundation construction.
-
How will the project address environmental concerns?The development team includes technical experts who will ensure the project will meet or exceed all environmental requirements.
-
Will there be a lot of dust and debris from the construction?We have a comprehensive construction management plan designed to minimize dust, manage debris, and maintain a safe and orderly site with minimal disruption to the surrounding community. This includes effective screening around the construction area to contain any potential impact. Once construction begins, we will share the contact information for our construction manager, who will be available to promptly address any questions or concerns you may have throughout the construction phase.
-
How will the project address drainage, noise from ventilation, and foundation depth?The project includes enhanced stormwater management plans to ensure proper drainage, including the use of French drains where necessary. Service areas are designed to minimize noise and visibility impacts, ensuring that ventilation systems will not create significant disturbances. Additionally, the foundation will be designed to meet the site’s requirements, with specific details provided in the construction plans to ensure stability and proper integration with the surrounding area.
-
What safety measures will this project include?We prioritize the safety of the residents and community and will provide security, including 24-hour surveillance on the property and pedestrian pathway. This walkway will feature well-lit areas, 24-hour security monitoring, and gated access from dusk to sunset for neighborhood residents.
-
What is the current status of property ownership, and what details are available regarding the current owners and residents?We have agreements in place with all existing homeowners at the location, with the completion of all closings expected by mid-2025. However, details regarding purchase prices, buyout arrangements, or specific closing dates are confidential and cannot be disclosed at this time.
-
How will the project affect property values in the immediate area?This project is expected to boost nearby property values. Additionally, upon completion the project will deliver $2.7M in tax revenues to the City of West Palm Beach annually, compared to $46,000 today. This can be used to help fund public services and areas.
-
Will there be affordable housing included in the development?While this is considered a luxury residential project, it will offer an array of pricing options based on the floor plans and level.
-
How will the project be financed, and what are the potential associated risks?A well-established and reputable development team is funding the project through completely private means.
-
How can local residents stay informed about the project?We are committed to keeping local residents well-informed throughout the duration of the project. We will provide regular updates on our plans, construction schedule, and any potential impacts. Once construction begins, detailed information will be available through our construction manager on our website. Additionally, residents can contact us directly by phone at (561) 247-4121 or via email at info@3705southflagler.com for any inquiries or further information.

Meet Our Team

Perko Development Partners
Perko Development Partners is a distinguished real estate developer located in Jupiter, Florida with a specialized focus on condominium buyouts, renowned for their strategic acumen and commitment to transformative urban redevelopment. With over 75 years of combined experience in the industry, Perko has successfully navigated complex buyout negotiations and executed high-impact redevelopment projects that revitalize communities and maximize property value.
Perko's expertise lies in identifying and acquiring condominium properties with the potential for significant enhancement and redevelopment. Their approach is distinguished by a thorough understanding of market dynamics, regulatory frameworks, and community needs, ensuring that every buyout opportunity is approached with precision and care.
Perko’s portfolio showcases a diverse array of successful condominium buyouts, where they have transformed aging or underperforming properties into modern, sought-after residential spaces. With a passion for creating vibrant, enduring communities, Perko has built a reputation for developing properties that not only meet the highest standards of quality but also advance environmental stewardship and community resilience.

Kolter Group
Headquartered in Palm Beach County, Florida, a winner of numerous industry awards, and has introduced a vision for luxury that is continually raising expectations for homebuyers and establishing new standards for the industry.
Kolter Group has invested in $29 billion of completed and in-process projects, expected to deliver over 5,600 waterfront, water view and amenity-rich urban condominium and townhome residences. These exceptional residences are located in some of the most desirable locations in Florida and the Southeast, including the Palm Beaches, Fort Lauderdale, Sarasota, St. Petersburg, Tampa and Atlanta.
Contact Us
3705 South Flagler Drive
West Palm Beach, FL, 33405
(561) 247-4121
